Mur Design Wall Panels Installation
Leave panels in the room where you plan to install them between 48 and 72 hours prior to installation to acclimate panels to the room s temperature and humidity level.
Mur design wall panels installation. Instruction guide murdesign panels preparation. To successfully install your walldesign panels. Take into account the humidity level of the room where you will be installing your panels. A simple precaution will guarantee the problem free installation of your long lasting panels.
They must be strongly fixed. Plan an interval of 0 476 cm 3 16 inches at the corners of the walls as well as a space of 1 9 cm 3 4 inches at the bottom of each panel. You need to pay particular attention to the level of humidity of the room where you will fix panels. Murdesign s tiles and panels have acoustic characteristics similar to those of gypsum.
Although it is possible to install the panels on a surface other than a wall of gypsum or plywood we recommend having a solid base and level. Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube. Above all store your walldesign panels for a period of 48 to 72 hours in the room where you plan to install them. Place panels flatly on their length of 2 438 m 8 feet against the wall in way to allow air circulation between panels.
Your walls must be leveled as much as possible. Plan an interval of 0 476 cm 3 16 inches at the corners of the walls as well as a space of 1 9 cm 3 4. They are not designed to soundproof a room. Before fixing panels place them without glue to ensure they fit properly.
Decorate each room in style with our high end quality products.